Category: Solar Journeys

  • Lancaster solar power

    Lancaster solar power

    Eight panel solar installation, including battery storage and emergency backup suppy at this property in Lancaster Preparation Before the main installation began, we had to prepare for the panels. This included mounting the batteries, the inverter and installing a new distribution board for UPS backup power system. Black plastic conduit ran up the outside of…

  • Backup power supply restored – Endmoor

    Backup power supply restored – Endmoor

    This customer had a faulty battery backup system, linked with their solar panels and inverter. Preparation The first few hours of the job were spent examining the existing installation and diagnosing the problem with the backup changeover switch. The customer also decided to replace the older Gen 1 GivEnergy inverter for an upgraded Gen 3…

  • Tools for roof-mounted solar installations

    Tools for roof-mounted solar installations

    See below for a run through of the tools we use when we’re up on the roof! Our List PPE and storage Roofing tools Equipment Why not head to somewhere like https://its.co.uk/ to start building your tool kit! Find out more To see more information, or let us know how we can help you with…

  • Solar panel installation in Grange-over-Sands

    Solar panel installation in Grange-over-Sands

    The process At this charming property in Grange-over-Sands, eleven solar panels, a GivEnergy power converter (PCE), a 9.6kWh GivEnergy battery, and an emergency battery backup system were installed. Firstly, the cables for the DC current from the generation to the PCE were run in plastic conduit located out of the way, near the roof soffit.…

  • PV installation in Warton

    PV installation in Warton

    The process Seven Longi photo-voltaic (PV) panels were installed onto a slate roof during the summer, accompanied by a Sofar inverter and a Pylon battery. The cables were run under the roof’s overhang, using baton wood and cable clips, and then hidden by new soffit boards. For the roof work, two towers were assembled to…

Phone
Mail
WhatsApp
Get in touch